Create a complete load list
Separate treatment, pumping, compressed-air, filling and packaging equipment. Record rated electrical input and the operating sequence. Adding only mechanical motor HP can miss auxiliary loads and power-factor effects.

Your water plant’s pumps, compressors, RO, filling and packing equipment form one load picture. Share their ratings and starting sequence so we can review the right servo configuration.
Discuss your applicationA clear equipment list helps us review the servo configuration for your site.
Share machine nameplatesSeparate treatment, pumping, compressed-air, filling and packaging equipment. Record rated electrical input and the operating sequence. Adding only mechanical motor HP can miss auxiliary loads and power-factor effects.
Pump and compressor starts can change demand. Review motor-starting methods and whether starts overlap with the running plant. A fixed “add 1 KVA” rule is not a reliable basis for every installation.
Record minimum and maximum incoming voltage with a qualified electrician. For a three-phase plant, check the relevant phases and the equipment’s permissible supply conditions. Specify the required input window and nominal output in the quotation.
Water-plant areas can include moisture and cleaning activity. Confirm installation location, enclosure suitability, cooling, ventilation and service access. Freight, installation and on-site support are confirmed against the actual enquiry.
List feed pumps, high-pressure pumps, air compressors, filling equipment and packaging loads separately. Record which run together and whether pump or compressor starts overlap. Water-production capacity alone does not establish the electrical KVA.
Share electrical nameplates and the starting sequence. Confirm a suitable enclosure location away from water exposure and with access for service.
Read the KVA selection guide


Pump and compressor starts can change demand. Review motor-starting methods and whether starts overlap with the running plant. A fixed “add 1 KVA” rule is not a reliable basis for every installation.
Air-cooled designs release heat to the surrounding air and need suitable ventilation. Oil-cooled designs transfer heat through insulating oil and need an appropriate enclosure location and service access. We select cooling from the offered design, load, operating hours and site conditions.
No. The application name is a starting point. The actual electrical load, supply phase, voltage window, starting demand and equipment requirements determine suitability.
Send your machine details on WhatsApp, or leave your number. We’ll help you take the next step.
Send a nameplatePrefer to talk? +91 76696 69400Just your name and number to get started.